The interval from the time of submission of a process to the time of completion is termed as ____________

waiting time
turnaround time
response time
throughput
turnaround time  

Related posts

Scheduling is done so as to ____________
A. increase CPU utilization
B. decrease CPU utilization
C. keep the CPU more idle
D. none of the mentioned
In multilevel feedback scheduling algorithm ____________
A. a process can move to a different classified ready queue
B. classification of ready queue is permanent
C. processes are not classified into groups
D. none of the mentioned
What is FIFO algorithm?
A. first executes the job that came in last in the queue
B. first executes the job that came in first in the queue
C. first executes the job that needs minimal processor
D. first executes the job that has maximum processor needs
Under multiprogramming, turnaround time for short jobs is usually ________ and that for long jobs is slightly ___________
A. Lengthened; Shortened
B. Shortened; Lengthened
C. Shortened; Shortened
D. Shortened; Unchanged
In the following cases non โ€“ preemptive scheduling occurs?
A. When a process switches from the running state to the ready state
B. When a process goes from the running state to the waiting state
C. When a process switches from the waiting state to the ready state
D. All of the mentioned
Which is the most optimal scheduling algorithm?
A. FCFS โ€“ First come First served
B. SJF โ€“ Shortest Job First
C. RR โ€“ Round Robin
D. None of the mentioned
An I/O bound program will typically have ____________
A. a few very short CPU bursts
B. many very short I/O bursts
C. many very short CPU bursts
D. a few very short I/O bursts

Leave a Reply

Your email address will not be published. Required fields are marked *