Skip to content
MCQtimes.com
GK
Pakistan Studies
Current Affairs
Islamic Studies
English
MCQtimes.com
Toggle Menu
Cost Accounting
Home
/
Cost Accounting
- Page 102
Show/Hide Answers
Cost Accounting
The production volume variance under variable costing is
must
not a must
non-inventoriable
inventoriable
Author:
rikazzz
Comment
Cost Accounting
The cost function, in which cost does not change with any change in level of activity is a part of
step price functions
step object functions
step constant functions
step cost functions
Author:
rikazzz
Comment
Cost Accounting
If the target net income is $36000 and the tax rate is 40%, then the target operating income will be
$10,000
$20,000
$40,000
$60,000
Author:
rikazzz
Comment
Cost Accounting
A technique which minimizes sum of squared vertical difference, to determine the regression line is considered as
negative square technique
positive square technique
least square technique
most square technique
Author:
rikazzz
Comment
Cost Accounting
The step by step business functions, in which product or services must have customer usefulness, is classified as
value chain
useful chain
product chain
services chain
Author:
rikazzz
Comment
Cost Accounting
In actual costing, an actual quantity of used inputs are multiplied with actual prices to calculate
fixed direct manufacturing cost
variable direct manufacturing cost
fixed indirect manufacturing cost
variable indirect manufacturing cost
Author:
rikazzz
Comment
Cost Accounting
Which of the following is to be called product cost?
Material cost
Labor cost
FOH cost
All of these
Author:
rikazzz
Comment
Cost Accounting
The costing technique, which classify all the activities in costing hierarchy is classified as
activity based costing
non-financial costing
profit costing
lump sum costing
Author:
rikazzz
Comment
Cost Accounting
The denominator of the fixed manufacturing cost rate is
adjusted labor utilization
unadjusted labor utilization
material utilization
capacity utilization
Author:
rikazzz
Comment
Cost Accounting
If the variable overhead flexible budget variance is $26000 and the flexible budget amount is $15000, then the actual incurred costs will be
$21,000
$11,000
$31,000
$41,000
Author:
rikazzz
Comment
Page navigation
Previous Page
Previous
1
…
100
101
102
103
104
…
137
Next Page
Next
Go to Page
Light
Dark
GK
Pakistan Studies
Current Affairs
Islamic Studies
English